

Construction of a Cycle and Pedestrian Subway
at Reggio Emilia Station, Italy
A cycle and pedestrian subway (right) was constructed using the "Istrice" method under a network of 9 railway tracks. The tunnel needed a total push of 73.65 metres in two sections. 12 jacks were used for a total load of 3400t
